T Racking has the whole equipments to tool racking & shelving product from steel coil taken into factory to packing, loading and installation(for local project)
The normal tooling process is as below: 
Our quality control team specialist will control the quality of product through all the process. The tooling process is according to National standards strictly and inspected random by the QC team.
Any product don't meet the standard will be pick up and rework again to make quality product for the customers.
The major national standard for racking and shelving as as below:
No. |
Item |
Description |
1 |
Racking Manufacturing |
CECS23:90《Racking Design Standard》
JB/T 5323-91《Steel Racking Technical Condition》
JBJ9-87《Steel Structure Design Standard》
ZBJ83015-89《High Steel Racking Design Standard》 |
2 |
Surface Treatment |
GB8932、GB9266-88 |
3 |
Racking Installation |
JB/T5323-91 |
4 |
Inspection Standard |
JB/T5323-91 |
5 |
Bolts & Nuts |
GB5781-86
GB5783-86 |
6 |
Strength Standard |
JB/T5323-91 |
Our design also complies with the major popular standards in the world, like FEM, SEMA, ASRS, which help our product sell well through the world.